Schedule Apr 13, 2007
Discussion: Type Ia SN Delay Times: Expectations and Measurements
Rosanne Di Stefano (Harvard, CfA & KITP), Andy Howell (University of Toronto & KITP), Chris Pritchet (University of Victoria & KITP)


Other video options

To begin viewing slides, click on the first slide below.


Rosanne Di Stefano's slides (or, view as pdf)
[01] [02] [03] [04] [05] [06] [07] [08] [09] [10] [11] [12] [13] [14] [15] [16] [17] [18] [19] [20] [21] [22] [23] [24] [25] [26] [27] [28] [29] [30] [31] [32]
Andy Howell's slides (or, view as pdf)
[33] [34] [35] [36] [37] [38] [39] [40] [41] [42] [43]
Chris Pritchet's slides (or, view as pdf)
[201] [202] [203] [204] [205] [206] [207] [208] [209] [210] [211] [212] [213] [214] [215] [216] [217] [218] [219] [220] [221] [222] [223] [224] [225]

Author entry (protected)